Legacy Way Tunnel (2015)

JT-C-1026 Brisbane, Qld Installed June, 2015 Partnering with Schneider & Transcity  
    204 Signs Total

55x Tunnel Message Signs (TMS)

1x VMS, Size B

1x VMS, Size A

7x Changeable Message Sign (CMS)

140x Lane Ute Mgt Signs (LUMS) & Variable Speed Limit Signs (VSLS)

 

In addition to custom mechanical design, manufacture, installation and commissioning, J1-LED also designed and installed the control room video wall. 

 20150625 DSC1310 800x452

TMS Legacy - Moggil 800x485 TMS Legacy Mt Coot-tha 800x593

20141222 DSC7118 CW for-web